Showing posts with label specifications. Show all posts
Showing posts with label specifications. Show all posts

Thursday, September 22, 2011

Bridge the Gap

I have a meeting today with a general contractor and the goal is to help bridge the gap between the budgetary number on a project and what the hardware specifications are calling for.  In this case the architect was hired by the GC and I am pretty sure the spec writing was farmed out to a manufacturer's spec writer.  There must of been a lack of communication somewhere because the hardware specs are so over the top to what was budgeted there is a $100,000.00 gap.

I understand that a manufactures spec writer's job is to spec the products of their employer.  I just don't understand why it sometimes seems as if only the most expensive line of those products are included.  These days most manufacturers offer both a Grade 1 and Grade 2 line of products.  Depending on the building I can appreciate utilizing Grade 1 at the openings that will get the most use but on those openings that don't, bring it down a notch.

Just my opinion.  Feel free to offer yours in the comment section below.